Our house is only a week old and already a major issue at the village gossip. Our neighbors were all nice, but there are also opposing voices in the village. Statements such as "gruusiges Huus" (in German: horrible house) were killed. A resident of our village, the amateur artist, gave us a guardian angel and a heart made of wood past (which we found very nice) and read on this occasion the same show the house. The significance of his statement "With this umbrella, you have two full floors at a low ridge height. Do not understand all this" we have later understood. The roof shape will be our offensive, we thought, and realized during the meeting of the Technical Committee of our community through appropriate responses.
When times have all become used to the sight, then it will be quiet again.
However, we allow about other village gossip, if our house gets the final touch.
Thursday, August 26, 2010
Wednesday, August 25, 2010
Polaroid 500 Instant/ Captiva Joycam Filme
House position last day
After Thursday night, yet all remains were removed in the target fixed, so that the troop build again the next day to work undisturbed, we saw on Friday morning, a bit wrinkled. The
Prüfstatiker was already there when we arrived. This time, he appeared satisfied, and certified us a perfect Statics. Around noon, our site manager and then spoke with us by the other end and gave us a plan, when what is done. Also
to this day the building has again rangeklotzt squad properly. Actually, if you where around 11:00, but was still so much to do, that it was 19:00 and they finally, richer every good a bottle of wine could be on your way home about 700km wide. Before departure there was a celebration evening feast.
The foreman of the construction crews have thanked us for the amazing time. Sounds funny, but be so. An all-round supply of food and drink is probably not more common.
was then the house will definitely us and we could finally really admire.
begin And with the expansion pack. This will keep us busy for some time.
After Thursday night, yet all remains were removed in the target fixed, so that the troop build again the next day to work undisturbed, we saw on Friday morning, a bit wrinkled. The
Prüfstatiker was already there when we arrived. This time, he appeared satisfied, and certified us a perfect Statics. Around noon, our site manager and then spoke with us by the other end and gave us a plan, when what is done. Also
to this day the building has again rangeklotzt squad properly. Actually, if you where around 11:00, but was still so much to do, that it was 19:00 and they finally, richer every good a bottle of wine could be on your way home about 700km wide. Before departure there was a celebration evening feast.
The foreman of the construction crews have thanked us for the amazing time. Sounds funny, but be so. An all-round supply of food and drink is probably not more common.
was then the house will definitely us and we could finally really admire.
begin And with the expansion pack. This will keep us busy for some time.
Sunday, August 22, 2010
Sew Peg Peregohigh Chair Cover Tutorial
topping out at Orange
has the third day of house placement, our house changed appearance scarcely more. There was going on inside all the more to the point. The electrician, who is on the second Stelltag already been moved, moved at a breakneck speed for cable is a cable, so that on the afternoon of the fuse box hanging in the basement already and is probably wired this set.
The panels were laid out on the roof, installed the bushings and sealed everything. The panels were placed around and gutters soldered and mounted. Moreover, even were the missing pieces of insulation between the EC and the Supreme Court used, glued and stapled.
Our job that day was in turn is to lubricate the rolls, beverages and beizuschaffen animate our construction group to feed. deliver for the good work the guys, that's the least we can do.
Now and then we could catch a peek into the rooms and look at the progress. But actually we were very restrained. The curiosity was big, but we did not want the guys standing around in the road.
The organization of the topping-out ceremony ran from time to time by the way in the last days. At 19:00 it was time. Many relatives and our parents were found in our a new home to celebrate with us topping. Also our structure and our squad is still finger-home-sales consultant has taken over the 100km route up and came together with his wife. Preferably we would have invited all employees of finger-house who were involved in our building, but Frankenberg is then something far away. Let's say you
: It is not easy in the middle of summer, raise a pine tree as a guide. Anya's father in the emergency summarily in the garden of his neighbors like a pine tree (of course with his blessing). The relatives have already arrived then hurry the trees still decorated with colorful Something Strip. All
chaotic and uncoordinated something, but who knows us knows that this is the normal state. Somehow we have managed it but then the topping to have everything cut and dried. Even the weather has turned dry and sunny in time.
had only the foreman of the construction crews work we extensively because he has something to rise adorned with us (before the entire audience) on the stand and recite a judge's decision. After some persuasion but also folded.
This was also inaugurated our little house in style. After extensive tours gave
house it then for us the opportunity finally sit and eat in a nice little lap. We
found the topping successful and want us on this path once again thank everyone who came and / or contributed to the success.
has the third day of house placement, our house changed appearance scarcely more. There was going on inside all the more to the point. The electrician, who is on the second Stelltag already been moved, moved at a breakneck speed for cable is a cable, so that on the afternoon of the fuse box hanging in the basement already and is probably wired this set.
The panels were laid out on the roof, installed the bushings and sealed everything. The panels were placed around and gutters soldered and mounted. Moreover, even were the missing pieces of insulation between the EC and the Supreme Court used, glued and stapled.
Our job that day was in turn is to lubricate the rolls, beverages and beizuschaffen animate our construction group to feed. deliver for the good work the guys, that's the least we can do.
Now and then we could catch a peek into the rooms and look at the progress. But actually we were very restrained. The curiosity was big, but we did not want the guys standing around in the road.
The organization of the topping-out ceremony ran from time to time by the way in the last days. At 19:00 it was time. Many relatives and our parents were found in our a new home to celebrate with us topping. Also our structure and our squad is still finger-home-sales consultant has taken over the 100km route up and came together with his wife. Preferably we would have invited all employees of finger-house who were involved in our building, but Frankenberg is then something far away. Let's say you
: It is not easy in the middle of summer, raise a pine tree as a guide. Anya's father in the emergency summarily in the garden of his neighbors like a pine tree (of course with his blessing). The relatives have already arrived then hurry the trees still decorated with colorful Something Strip. All
chaotic and uncoordinated something, but who knows us knows that this is the normal state. Somehow we have managed it but then the topping to have everything cut and dried. Even the weather has turned dry and sunny in time.
had only the foreman of the construction crews work we extensively because he has something to rise adorned with us (before the entire audience) on the stand and recite a judge's decision. After some persuasion but also folded.
This was also inaugurated our little house in style. After extensive tours gave
house it then for us the opportunity finally sit and eat in a nice little lap. We
found the topping successful and want us on this path once again thank everyone who came and / or contributed to the success.
Free Sample Of Invitation Card Dedication
Stelltag
He is kind long gone, but we still wanted to give a little back on this day.
As I said, were built after the first Stelltag all walls. Only the roof was missing. So we continued on the second day. Right on time at 7:00 was our building troop arrived back full strength and took the "parked" Mittelpfette addressed.
But before anything was shipped. This time the question was not necessary for the "What?". At the sight of the truck was clear that our Baustellenklo found their way to us added. Finally we were allowed to make what once again. Because of the way to the parking lot was blocked, we have it unceremoniously into a "flying" Dixi.
vergurtet Well, it was his first flight to his location.
went Then on to the roof.
At 12:30 this was done, apart from the sheet metal covering. The first was flown only once.
But that was our house at least ever rain. The Prüfstatiker was already there in the morning and was not yet satisfied. A later conversation with the head of the construction crews then explained why. Troop build the focus was on only once to get the house tight, as the weather was unpredictable, the Prüfstatiker the ineressierte but very little. There were missing screws, which were important for the statics, but later can easily be introduced. Since
were the last two days with noise from morning to evening and a road closure may not exactly pleasant surrounding for all residents, we have summarily that evening for a drink invited House Tour. It was supposed to start at 19:00. Then, when there still was no one at 19:30, of ridicule some disappointment. But then came the first. And finally all came, we had invited. It was a nice evening in which we were allowed time to get to know all our neighbors. If you do not build a new housing development, but almost in the village, where they treated the neighborhood or otherwise, this drink turned out to be a good idea. Prompt we got help offered. The blocks on which we now stand "around gymnastics" comes from a neighbor. All nice people.
Exhausted, but happy we went back towards the still broken "old" home.
He is kind long gone, but we still wanted to give a little back on this day.
As I said, were built after the first Stelltag all walls. Only the roof was missing. So we continued on the second day. Right on time at 7:00 was our building troop arrived back full strength and took the "parked" Mittelpfette addressed.
But before anything was shipped. This time the question was not necessary for the "What?". At the sight of the truck was clear that our Baustellenklo found their way to us added. Finally we were allowed to make what once again. Because of the way to the parking lot was blocked, we have it unceremoniously into a "flying" Dixi.
vergurtet Well, it was his first flight to his location.
went Then on to the roof.
At 12:30 this was done, apart from the sheet metal covering. The first was flown only once.
But that was our house at least ever rain. The Prüfstatiker was already there in the morning and was not yet satisfied. A later conversation with the head of the construction crews then explained why. Troop build the focus was on only once to get the house tight, as the weather was unpredictable, the Prüfstatiker the ineressierte but very little. There were missing screws, which were important for the statics, but later can easily be introduced. Since
were the last two days with noise from morning to evening and a road closure may not exactly pleasant surrounding for all residents, we have summarily that evening for a drink invited House Tour. It was supposed to start at 19:00. Then, when there still was no one at 19:30, of ridicule some disappointment. But then came the first. And finally all came, we had invited. It was a nice evening in which we were allowed time to get to know all our neighbors. If you do not build a new housing development, but almost in the village, where they treated the neighborhood or otherwise, this drink turned out to be a good idea. Prompt we got help offered. The blocks on which we now stand "around gymnastics" comes from a neighbor. All nice people.
Exhausted, but happy we went back towards the still broken "old" home.
Tuesday, August 17, 2010
How To Get Rid Of Popped Blood Vessels
second update of the first control day
10:55 clock - The roof is between parked on our driveway.
12:14 clock - the staircase is flown
After some effort the stairs sat at 12:34 clock.
Here are a few little things, but with the stairs is the "lunch break destination" to the extent achieved, so that we can serve.
then grew our next house in the same speed:
15:36 clock - the last exterior wall on the first floor was completed and our Special staircase window was installed. Actually, we still wanted the document separately, but the boys have the irgendwannmal "foisted" and we have only seen it then, when it was already there.
18:45 clock - after all the small parts were placed in the OG flies, the last purlin into place - or not. You must stay on the scaffolding
18:53 clock - the last material was loaded, allowing the truck driver to move back gene Frankenberg. For the development squad was also here in the end. There was a beer, then the construction crew has made their way to your accommodation.
The building owner was of course even longer on the site. The roadblocks would be removed, as the dirt road and sidewalk. Since it was muddy today and tomorrow everyone is drübergehoppelt our basement, saw them off as well accordingly. After work we went again strolled through the rooms and took a look at the sun (despite otherwise stated report was hardly a drop of rain and, as I said there was even a sunset) - we are happy, it was better not to end the day: -)
also again a very special thank you to all three truck drivers. One was nicer than the other. Always good for a chat and always a lively spell on the lip (I only say "Menno "....). to see all three loaded trucks was already impressive:
10:55 clock - The roof is between parked on our driveway.
12:14 clock - the staircase is flown
After some effort the stairs sat at 12:34 clock.
Here are a few little things, but with the stairs is the "lunch break destination" to the extent achieved, so that we can serve.
then grew our next house in the same speed:
15:36 clock - the last exterior wall on the first floor was completed and our Special staircase window was installed. Actually, we still wanted the document separately, but the boys have the irgendwannmal "foisted" and we have only seen it then, when it was already there.
18:45 clock - after all the small parts were placed in the OG flies, the last purlin into place - or not. You must stay on the scaffolding
18:53 clock - the last material was loaded, allowing the truck driver to move back gene Frankenberg. For the development squad was also here in the end. There was a beer, then the construction crew has made their way to your accommodation.
The building owner was of course even longer on the site. The roadblocks would be removed, as the dirt road and sidewalk. Since it was muddy today and tomorrow everyone is drübergehoppelt our basement, saw them off as well accordingly. After work we went again strolled through the rooms and took a look at the sun (despite otherwise stated report was hardly a drop of rain and, as I said there was even a sunset) - we are happy, it was better not to end the day: -)
also again a very special thank you to all three truck drivers. One was nicer than the other. Always good for a chat and always a lively spell on the lip (I only say "Menno "....). to see all three loaded trucks was already impressive:
Sunday, August 8, 2010
Little White Particles In Urine
bay
So, yesterday was our new neighbor talk time for us to us via a protruding bay window in the 3-meter limit distance. We want to build a towering bay window at the side of our house, it is fully glazed and 80 cm deep.
Our neighbor is willing to register with a public easement, so that we can build the bay window. Yay!
can then now the planning application be submitted. Our architect, this is Mrs. Smith to address.
So, yesterday was our new neighbor talk time for us to us via a protruding bay window in the 3-meter limit distance. We want to build a towering bay window at the side of our house, it is fully glazed and 80 cm deep.
Our neighbor is willing to register with a public easement, so that we can build the bay window. Yay!
can then now the planning application be submitted. Our architect, this is Mrs. Smith to address.