Tuesday, December 28, 2010

Swot Opportunities Salon

own power unit 2

After Jörg had indeed begun on the 2nd Christmas Day with the primer have We made the food on Monday.
Since this year I just have to work on Thursday I had decided to cancel our big me to the make.
said than done, Gaby and Mike have noticed it and have one of their holidays sacrificed for us and have come to help.
After some initial difficulties had (color my parents are in the attic and was unfortunately froze) and buy a new color, it could finally go off. Mike is happy to emphasize the practice ziehmlich and thus we have geschaft painting all three children's rooms first miss.

Diapers Heavy Periods

sampling III, 23.12.2010, Bad Vilbel Showhouse II

Today was the sampling of the basement and electric on.
Mr. Miller from the company building project, our Kellerbauer agreed to make an appointment, the commission together with the community and the power supplier / gas provider. We
an air- Water heat pump, we'll probably not multi-branch service entrance, but will rely on individual accounts.
Fischer electric fishermen from Hunsrück Kastellaun took us in small working electrical outlets, light switches, motor switches for blinds, lamps, Internet and telephone connections, etc. through. Also
Fischer had much patience for us and our ideas. Of course, here was a Aufmusterung not.

Saturday, December 25, 2010

Wrist Joint Pain Dehydration

Christmas Update

we have today on 1 Christmas Day made a trip to our house to see if the to-do list is processed.

The access was difficult in the construction area itself was it better.


aufeschlossen When we have, we saw the first changes.
In the hall, a painter was spread the fleece was not there before.
In Hall and kitchen were zugespachtelt the holes in the ceiling.


The next glance went to the bathroom.
The tilers were back.




Tuesday, December 21, 2010

Chow Chow X Poodle Mix

fireplace

says the offer of a visit from our oven maker to us, the company Pertschy-unikate today awarded the contract from us.
Mr. Pertschy us the offer represented visually via Google Sketchup and We really enjoyed it.

Sunday, December 19, 2010

Music For Tae Kwon Do Demo

sampling II, 12.17.2010, Mainz

Today was the sampling of the sanitary and heating planned.
We were led through the exhibition from Köbig in Mainz and we could choose our bathroom and separate WC facilities.
Unfortunately we liked most parts of the equipment is not included, so we had to cheer some variants.
were particularly tub and sink changed by us. The toilets adapted to the chosen by us sink, but also in the fittings on it we had to put a few euros.
a personal decision was to buy a shower drain instead of a shower tray, so that even here additional costs incurred.
After 4 hours we were through with the plumbing parts, spoke briefly about the location of our heating and we could then take on the snowy back home.

Saturday, December 18, 2010

Face Paint Jeff Hardy Game

own power roof tiles sees expansion

Dear Reader,

I have today to a disastrous day (router is defective, damaged car, 2 hours cks himself under the car) met with Olli at the attic expand as footprint.
We bought 2 weeks ago at Max Bahr Rauspund with 25% discount (discount promotion for cardholders) and brought to the attic. We have spent so about 4 hours up there and have about half made it. Sorry, I forgot to take pictures.

What I noticed immediately that the electrician was there.
Our bell went, and lighting at the eave cornice is installed.
was outside When it was dark I turned on the lights and was glad that I have created the few euros more good. But see for yourself:





Wednesday, December 15, 2010

Xanex Quitting Smoking



The French balconies are now been assembled.




Sunday, December 12, 2010

Why Does Heart Rate Rise With Infection

building permit because I

Today we have received planning permission and fortunately was accepted everything as planned. Unfortunately, it creates
Frammelsberger do not meet the deadline for restoring the house, because the building permit would have to be present beforehand.
New date: calendar week 11 (March 14, 2011).

Saturday, December 11, 2010

Emblem De Pokemon Para Ragnarok

finished 37th

Although nearly 5 cubic meters of water were consumed in our house, the walls are still pretty dry. You can feel the moisture still in the air, but that's normal for a new building.

I should mention here again:
We are often on or in the house, but no matter when or where we have looked, it always looked tidy and Struckturiert! Kudos to our craftsmen!

The tiles are now completely up to floor tiles in the bathroom finished. It probably small problems with the flooring was in the bathroom.

Here are a few pictures for today:











Wednesday, December 8, 2010

Golden Empress By Stetson



Juhu Are there tiles!


Our tilers were very Fleisig!









Sunday, December 5, 2010

What Are Red License Plates Ontario

construction day 34 and 35 construction day

Finally they managed to replace the broken Regipsplatte in the stairwell.


Well yes and had to be the On Thursday started it was to fill in. It already looks really comfortable.
now are also announced as the building dryers on the ground and floor, even with some delay but they are and do well.
The electricians were busy again and have our fuse box fitted. The Baustromkasten Bauwasseranschluß and could be removed.
We ourselves were not entirely idle.
Yesterday morning we took the first major purchase for our house done, we bought a hammer drill immediately and Rauspund and deep groundwater with taken. Now it takes so much longer until we can start the strike. Sorry, we
had no camera with as we put the Rauspund to the attic, but we are still rich after pictures.