Scorpio Man The Worst

sampling, 02.12.2010 Oberkirch

clock was at 6 am going there to Oberkirch, where we arrived at 8:30 clock. After a coffee we were off: sampling of floor plans, windows, roof, chimney, shutters, doors, bathroom, guest toilet, Door, basement, window sills, door handles, how and in what direction to open the windows ....
min with a short lunch break of 30 for meat loaf and Wake took the samples as much as 12 hours!
Congratulations to Mr. Bechtold, our construction manager and Mr. Becht for the patience and effort, the two have been located.