Since the last entry a lot has happened.
end of last week was our only visible radiators in the house and that the Badezimmer.Unsere heating has also been entered into HW kept in the room.


was also installed a correct Stairway, because we, or Viebrock made on Sunday an open-shell and the visit to the circuit would have been too dangerous.
Since last weekend we did was not particularly warm Ö Lord. really sorry for except Gaby and Mike and a few new neighbors was only one couple.
I think so the Viebrock is something more was promised.
This week has been submitted already quite a pace.
Monday and yesterday the company was Merkens Civil Engineering at our site going and has to soakaway and SW / RW set lines.
We had been afraid that it might be nothing in this cold.
This morning I once again call-site manager with Mr. J. and I was quite surprised that the firm was the Hoth while residential lines to install. After all, we had all day today no longer as -7 ° C and it was blowing an icy wind.


But not only the company Hoth served our firm, including the electricians and heating engineers were busy because it is important that we now times may heat up the floor to keep it from Monday the tiler can do something.


early last week was noticed when we were pouring the floor in the first floor, a damaged drywall. She should be looking out already by the weekend, but even today it still was not done. J. was not at all enthusiastic about herrr and since tomorrow is the Fugerfirma and he wanted to provoke a stress at the same time he called on the drywall just 2 blocks away at work, he may still wanted on over here and fix fast times. Unfortunately we had to
tonight as we once again find the house that was the is done but still not. Too bad!