list of defects
Final acceptance of our house is imminent. Today the electrician came
again to set the remaining doses (anywhere where the drywall had to once again down, because water or ventilation came in) to install the Homeway system and install the switch covers.
We are pleased with the end (up the matter with the floor) very satisfied. The quality of all work was impeccable. Accordingly falls short of our list of deficiencies and consists almost exclusively of small things. Mainly bother us demolishing drywall that have been processed to build, quite wrongly, with a sledgehammer. In addition, the shutters in the kitchen is already at the first press was broken and sockets under the mirror in the bathroom cabinet were placed in the wrong distance. All the above points have already been corrected or the repair was promised. There are only two points that are in finger-house or in clarification. We report ..