Wednesday, September 29, 2010

Drivers Licnese Template

By day and by night ......

It has again some times done at Project Orange. Plastered our house is already longer. Then came the color. Unfortunately, it is much darker than we had expected.

on Tuesday then the scaffolders were back there and same is reduced. Now we can enjoy the sight of trouble-free and have used the same chance to make some pictures and share them online.


















interior has also done a lot. But to do elsewhere, and to another More time. When asked how much more exciting for our lighting was looking at the house, which arrived earlier in the week. So, off you turn the lights and try. Here are the results:

Wednesday, September 22, 2010

Interest To Put On Resume For Clothing Store Job

Orange - The movie

It's done. Our movies is ready and can be viewed by all interested parties. The pure construction time was about 16 hours and was "evaporated" in 10 minutes.

Have fun watching it.

Monday, September 20, 2010

Kod Seryjny Do X-blades

Larger events ...

.. casting their shadows.
Since we list our house in over 21000 (!) Images have noted (via webcam image every 2 seconds), we have now decided to turn it into a movie. So far, it always failed to technical limitations. So far we have not found a program that we 21 000 images from a movie makes, without taking leave or put it to the computer slow.
Thanks to a nice co-workers, who have the programs, we now have different versions in different qualities. The result is impressive, but even with 1.3 gigabytes of "something" too big to publish it on the blog.
Thank you so much on W. Martin for the great work.
Once we have shrunk the film to a uploadable Mass together, We will place it online.

Sunday, September 19, 2010

Saree Woman Showing Boobes

Mrs. Smith

On Wednesday of last week we have informed Mrs. Smith of the Planning Group TWO in Mainz and Mr Becht fact that the planning application so can not be tabled because denying us our neighbor's consent.
Mrs. Smith has displayed everything and left and took care of just around the creation of a second planning application. And look: on Saturday we had the planning application in the mailbox.
has real crazy how fast they made it.
A bouquet of flowers by Fleurop is already on its way!
goes on Today's Building Department to the final planning application submitted.
FINALLY!

Friday, September 17, 2010

Can You Cut Brownies With Cookie Cutters

drainage

We at the current offer of Aldi Süd and accessed over a dehumidifier in our possession.
This is since yesterday in operation and does a good job.
The device even has a hose connection so that you are not limited to the 5 liter container.
According to technical data, he makes 20 liters in 24 hours.
If it has served its purpose, we will use it in stock for drying laundry.

Thursday, September 16, 2010

Endometriosis Period Or Miscarriage

shudder ....

... on the facade. Not in a negative sense. Rather, we have already applied to the exterior plaster happy. The structure has become really nice, all surfaces very evenly. A compliment and a big thank you to the party who has plastered on Tuesday in a show of strength in our house. We have taken the boys as they arrived and then again when they were already finished. The boss told us that they had no lunch break and now must eat somewhere what you want. This request, we wanted to deny them of course not and have not held up longer.
As I said, the result is impressive:









The color of the facade will be next Week. We look forward to it and are curious if it comes out as it was on the small RAL color chart.

The screed dries blithely to himself. As far as we had him do not help with drying. Two times wipe the window, then it was over with condensation on the windows. That, in the previous post, mentioned hole in the floor in the bathroom is also stuffed. Looks a bit like stuffing. Not pretty, but rare:









runs today, the heating. After yesterday we took the condensate pump, our construction manager has now enabled the screed drying cycle. Pretty small is it. In our tests, they pumped up about 1.5 liters in about 25 seconds 3 meters. That should be enough for the condensate.
Since we have won two pump rates, we will make both a cluster. Falls from the one, it runs in the second over and then takes over the pumping task. The current (temporary) building looks like this:









the test "condensation" then ran just fine with our (very lovely) moved from sewage pipes.

Female Doctor Penis Examine

never leave you on an oral promise

So, now it has happened. On Monday, a deadline for signature of the building application be made by the neighbors.
And suddenly said Mr. M., that he likes to write the plans, but by no means a Public easement is registered.
He has promised us in person, that a public easement is no problem for him and gave us the approval for preparation of the building application.
He did so, that we ask in return with him a nicer fence between our properties.
knows that, he now said nothing and says even if we had never said anything to him by a public easement.
Incredibly, we have told him actually and he also explains what that means!
you never rely on what one suits you the other, only the writing matters!
Now we have spent almost 4000 EUR for the planning application and can put on it again EUR 2000, to to change this again.
is further amended our bay window of 80 cm to 35 cm, as far as the house up to 3m-limit distance.
I can not hold still!
Slowly things get tight, because in November the basement should really be made.

Tuesday, September 14, 2010

Heather I Deep Thoat 2009

Thailand upstairs

how we felt on Sunday as we screed is after the first back into the house could. On the upper floor there is a temperature of about 30 degrees with a humidity of 94%. Today
were temperature and humidity even tolerable. However, running the heater yet. Unfortunately we can not take out of service because our already mentioned, condensate pump is still not arrived.

The whole story began, however, on the floor a bit annoying. On Friday morning we still had the phone with our construction manager, who asked us again if we would get the bathtub faucet installed prior to Saturday. We were told that the surface is on Saturday, and until then all clients services must be met.
This meant for us no hassle. After work to get off to the hardware store to the necessary hardware for mounting the faucet and then chug comfortable to site. Once there we were
surprised that the silo for the floor was already there. A closer look then showed that the water hose so special about hanging. The blow struck us then as we saw that material passes from the pump and a thick black hose running into the house.
The view into the living room then brought certainty. The boys poured already and it is just Friday afternoon. We appreciate it when it's quick, but somewhere you should also take consideration of appointments. Single explanation conversation with the flooring installers showed that it takes about two hours.
then broke out with us hassle. The valve had to be installed, because the boys felt that they antanzen only because the bathroom is not again. One of them said we should still try to mount the valve once more, perhaps enough time, yes. And as always in such situations is not all that easy. The valve must be placed on a pedestal, because otherwise it sits too low, in addition, the connecting pipes for hot and cold water too short or too far away from the valve and must be renewed. Did you as a client but not necessarily always in the cellar. Time has unfortunately not enough to go around again in the Hardware something appropriate raise, especially since the floor layers were faster than they themselves have estimated.
It was agreed then finally care to avoid the fitting. A hectic glued rectangle Pappwinkeln then has the floor in this area be locked out. must not be
Had. Then, when our anger had subsided, we heard from the floor installers, that the date is already delivering on the last Monday with the company that the flooring was discussed, but these have the date change is not to finger-house and passed it to us. Communication is everything!

Friday, September 10, 2010

Leopard Print Wrapping Paper

lifting unit vs. Condensate pump

The next topic discussed was the proposed pumping station. The procedure for the condensate of the heating system is quite far down and can not in with the rest of the waste water drain. The heating contractor was able to give us any information to the required investment, but said that not one of us proposed condensate pump is sufficient. When we told him then that the proposed by us pump has a capacity of 200 liters per hour, his concerns were blown away. He had introduced himself under condensate pump something else.
To be sure, we demand again at Stiebel-Eltron, and get the info that they sell condensate pumps as an accessory to their heating systems. However, does the pump from Stiebel Eltron-250th to € --. If, after prices for other condensate pump look that is easily twice the normal market price. Mind you in a similar capacity. Furthermore, that offered by Stiebel Eltron-pump the Sauermann Condensate pumps are very similar (to say the least). These cost less than half.
As eye on the pump purchase.
appearance does such a pump like this:

Thursday, September 9, 2010

Toddler Hit In Stomach

.... With Mach3

... or something like it is with us now.
On Monday came the people from the heating and plumbing. On Thursday morning they were finished, have a briefing made to the LWZ303 and was followed directly from the floor installers. On Thursday evening was already the whole house for the screed is prepared. All airbags are already there on Saturday and then comes the screed. Next week will come even the squad for outdoor cleaning. At the rate we do not get to everything on hold photos.
on Monday was the bare concrete on the ground to see. On Wednesday
looked like this:


On Thursday this:


But let's start at the beginning. The heating engineer had already committed to the building site discovered the first problem. Briefly went here once on the said dark clouds. We had forgotten in the basement of a third wall opening for the waste water. This was recorded on some plans of finger-house on other again. A third wall without this breakthrough we have probably caught, as we left to make the wall openings (afterwards). Since the heating system is generally very high and in the equipment room space for a lot of ceiling takes to complete because there is little room for the waste water pipes to cross through the room.
first one has told us it was not possible embarrassment in this room to additionally sewage pipes on the ceiling. After much back and put over, we have agreed that the tubes are hung lower to make room for the waste water. The result was even better. The heating engineer had hung the pipes are only at the point (to about 40 cm) deep, where the sewage pipes are intersect.


The second problem was that we at a point a ceiling opening for the waste water had this breakthrough was sitting just above a wall.
The planning for the cellar went through so many hands and no one noticed that one should include avoiding the wall. In the interest of the construction progress, we then have the hole with the corresponding stem-made device. has taken time and was a huge mess, but eventually was the opening in the wall and the head of the troupe with the scope and execution satisfied.

Milena Velba Homeless Scene

Laaaangweilig

wait for the last 4 weeks we'll be making out of our building application and were yesterday told that the planning application is on its way to us. Now our neighbor has to sign (because of limit distance) and we still, then quickly, quickly to the building authority with it! We also
wait to written confirmation of our appointment setting, we have never received so far. What's taking so long?
Apparently one must sometimes just set on waiting times, because the Office of Land Management has received the request in late May to divide the land and not so far managed to make the split. This can only afford an office, right?

Wednesday, September 8, 2010

Pokemn Platinum Online

unexpected activities

While not everything is quite fresh:

Last Wednesday were suddenly pallets with STO-buckets on our property. Some raisin bombers had to have dropped during the day.
As work on the facade, however, are recognized only in a few weeks ago were looking at our foreheads (this is the correct plurality of face?) Bigger question mark. Of course we were concerned that the stuff "get legs" and it is known by 'the sun' are no better. We had said no decision would happen to something. Whatever the case, we are only allowed to stand for time and wondered just over it.
The answer came one day later.










When we stopped by at lunch on site (our "spies" were reported and activities in our little house) there was a 4 man squad on plastering the corners and the lower third. The head of the force was happy to provide information and then explained the situation. It fit just purely in the Tour of the Lords, so they quickly dropped in on us to miss a few preliminary work to do.












The boys were lucky to have had bright sunshine and blue skies.
During the preparatory work is it still too. And the pallets are gone too. Properly as they are, the guys have all taken to the basement. Less

had good weather, the heating and plumbing guys who started their work this Monday. Why here and in other dark clouds are raised, we will report later.

Wednesday, September 1, 2010

Moncler Jacket How To Clean

expansion pack and Co.

On Saturday after the local position (21.08) could we start with the expansion pack. On the advice of the project manager we had pushed all other work a week later, by two weeks to have time for the expansion pack. He was concerned that we do it in a week. The course has given us extra motivation. So let's get to
ran some grub. The first day proved a little difficult because everything was new and none of the was necessary routine. Accordingly, the result was a little leaner than in the following days. Because we had hard-working volunteers, we were able to fight on several fronts. Some have started on the ground floor the plaster on the ceiling to screw, others have started on the first floor with the insulation. Quick
fell on us that we have the difficulty of the high ceilings (some over 3.5 meters) is slightly underestimated. While we were with height-adjustable scaffolding frames, (a loan from a neighbor), well equipped, but the desktop is still very limited. At the end of the first day we had the plates in the kitchen and in a part of the living room above the floor was the insulation between rafters and the film in an area already inside.












Over the following days, we are fully focused on the floor and worked there in several rooms simultaneously. With increasing routine we went and our helpers each handle was easier on the hand and the progress from day to day.










The Thursday went almost entirely for an additional battens in the bathroom it. We have decided to do this because we want to use the bathroom recessed spotlights and violate the vapor barrier sheet did not want. We should have enough space under the gypsum boards have.
On Saturday there was still time major battle with five helpers. On this day, the bathroom upstairs was finished and closed the rest of the ceiling in the EC. At about 19:00 we could say: "We have done!" We thus need a week for the expansion pack.










Special thanks again to take this opportunity to all our helpers (The parents of both of us, Mario's brother and girlfriend Anya's brother, the extra help to 300km driving distance has accepted) You rule!

The accumulated experience and a few tips, we wanted to pass on this also:

Worried you a magazine screwdriver and a plate lift. No other tool can match this in terms of speed and precision.

order the clips in which the vapor barrier sheet is attached to cover, you can pre-cutting the tape with a sharp utility knife on the support layer into pieces. It's quick and the pieces can then be solved by the great support layer.

The gypsum boards are attached to the short side parallel to the battens. If they go into a room the direction of the plates move, but leave enough overhang so that it does not come at the transition to cracks.

Konterlattungsabstand upstairs max. 37cm (center to center Latte Latte). Two wooden slats as a stop to size, then the attachment of the battens is a breeze.

screw spacing for fitting the plasterboard must be max. Be 15cm. 42 screws per plate full power. Do not use parentheses (If the wood dries out, it may be that solved the brackets).

power cables for the lighting is best right after the battens pull to the right place, otherwise they easily fall into oblivion.

We have a total of approximately 3500 drywall screws and about 600 screws for battens and the like installed.