Thursday, September 16, 2010

Endometriosis Period Or Miscarriage

shudder ....

... on the facade. Not in a negative sense. Rather, we have already applied to the exterior plaster happy. The structure has become really nice, all surfaces very evenly. A compliment and a big thank you to the party who has plastered on Tuesday in a show of strength in our house. We have taken the boys as they arrived and then again when they were already finished. The boss told us that they had no lunch break and now must eat somewhere what you want. This request, we wanted to deny them of course not and have not held up longer.
As I said, the result is impressive:









The color of the facade will be next Week. We look forward to it and are curious if it comes out as it was on the small RAL color chart.

The screed dries blithely to himself. As far as we had him do not help with drying. Two times wipe the window, then it was over with condensation on the windows. That, in the previous post, mentioned hole in the floor in the bathroom is also stuffed. Looks a bit like stuffing. Not pretty, but rare:









runs today, the heating. After yesterday we took the condensate pump, our construction manager has now enabled the screed drying cycle. Pretty small is it. In our tests, they pumped up about 1.5 liters in about 25 seconds 3 meters. That should be enough for the condensate.
Since we have won two pump rates, we will make both a cluster. Falls from the one, it runs in the second over and then takes over the pumping task. The current (temporary) building looks like this:









the test "condensation" then ran just fine with our (very lovely) moved from sewage pipes.

0 comments:

Post a Comment