On Monday came the people from the heating and plumbing. On Thursday morning they were finished, have a briefing made to the LWZ303 and was followed directly from the floor installers. On Thursday evening was already the whole house for the screed is prepared. All airbags are already there on Saturday and then comes the screed. Next week will come even the squad for outdoor cleaning. At the rate we do not get to everything on hold photos.
on Monday was the bare concrete on the ground to see. On Wednesday
looked like this:


On Thursday this:


But let's start at the beginning. The heating engineer had already committed to the building site discovered the first problem. Briefly went here once on the said dark clouds. We had forgotten in the basement of a third wall opening for the waste water. This was recorded on some plans of finger-house on other again. A third wall without this breakthrough we have probably caught, as we left to make the wall openings (afterwards). Since the heating system is generally very high and in the equipment room space for a lot of ceiling takes to complete because there is little room for the waste water pipes to cross through the room.
first one has told us it was not possible embarrassment in this room to additionally sewage pipes on the ceiling. After much back and put over, we have agreed that the tubes are hung lower to make room for the waste water. The result was even better. The heating engineer had hung the pipes are only at the point (to about 40 cm) deep, where the sewage pipes are intersect.


The second problem was that we at a point a ceiling opening for the waste water had this breakthrough was sitting just above a wall.
The planning for the cellar went through so many hands and no one noticed that one should include avoiding the wall. In the interest of the construction progress, we then have the hole with the corresponding stem-made device. has taken time and was a huge mess, but eventually was the opening in the wall and the head of the troupe with the scope and execution satisfied.