Another work day is over and it's a lot going on.
to site:
The electricians have installed plenty of cable channels and pipes.
We have not forgotten the drywall.
The pitched roof and the ceiling on the upper floor are completely covered with plasterboard.
also are the metal rails on the floor come hion where later the walls.
whether LI electric methods really know what do they do? As is a tangled mass of cables from the attic, the ceiling down.
The electricians have at our Kitchen Studio pushed to the installation plans.
The problem was, postponed the Viebrock the window is not as agreed. would thus extend the dish-in the window.
It is about 5-10 cm.
Too bad this is not happening we are annoyed about right doll.
As we stood in a tight spot, Nici has had to reschedule again into the kitchen studio to the kitchen.
0 comments: