SPÖ chairman Peter Grebenz: Yesterday was the involvement of citizens regarding the planning process "Upper Street
I because of a leg injury, the facilitation of a group had to cancel, but jumped the Vice-Fri Bgm. one! In this way, many thanks!
was in the community council meeting last week of the planning process, "Upper Street" and the citizens' participation in last Monday an agenda item. At the GM meeting, the factions were supposed to give their views known. In my speech back but was not done so because I believed that first the citizens must be heard, and only then are the political representatives of this civil order have to make!
Exactly these remarks of mine, was used by Mr. Mayor as the final movement of the previous evening. I am glad that so, the opinions of myself and the Mayor of Mr. compliant!
The planning process and the related solutions I give subsequent to major concern
- is fact that the upper road has become a short cut for some time.
- Fact is that the upper road is not for higher speeds, as they are often driven, is suitable. This is a hazard for all road users, particularly for cyclists and pedestrians. Particularly at risk are school children!
- Fact is that since the involuntary blocking of the structure-stars hotel of the traffic has decreased by more than half, because it was so unattractive by the interruption of a Schleichwegroute.
- Fact is that the L 3 is the main traffic route through Wolfurt, and is also carried out mainly on this road. The L 3 is superior road network over the higher road. Just as the highway superior road network to the L 3. No one should be happy when traffic would shift from the highway to the L 3.
- Fact is that the reconstructed star place gets a space-like design and construction phases so that the future of the core zone straw village to the east can be continued. This intersection is the union of church and Hofsteigstrasse, and the bottleneck stars garden restaurant and the entrance to Vogewosi settlement. make
- To the top line for the slow transport less attractive and safer for all road users, it needs a cohesive solution to all WolfurterInnen.
- Clearly demonstrated that a cut in the stars-hotel, connected to a 30-speed zone on the upper road and construction work in the church and for all Hofsteigstraße WolfurterInnen as the most reasonable solution could be found.
- The block at the level of star-hotel would have to be flexible so that the upper road, if necessary (congestion, Bus access to hotel, emergency vehicles, etc.) could be opened immediately.
- It is also superior to that right between the restaurant's garden and the entrance to the settlement Vogewosi without blocking the traffic continue to be funneled almost unabated would be. This means an unpleasant and dangerous situation for the users of the garden, and the users of the systems to be input. This must be a concise traffic mitigation will be taken. To this measure we do not get around!
- on the situation of the cross-links must also be taken into consideration. On the one hand, they must be able to handle the disposal of traffic, on the other hand, must and should they be the links to the cycle path routes in the north-south direction!
These considerations will apply in the future planning process to consider therefore a reasonable way to solve all the traffic problem on the upper road can be found. This is still an exciting planning process!